Hotel FF&E (Furniture, Fixtures, and Equipment) represents one of the single largest line items in any hotel development or renovation budget. For a mid-scale 150-room hotel, FF&E costs typically range from $2.5 to $6 million — and getting the specification wrong can mean costly replacements years ahead of schedule.

This guide provides a comprehensive, room-by-room checklist for hotel FF&E procurement, with budget benchmarks, specification tips, and vendor recommendations based on current market conditions.

📋 FF&E Budget Benchmarks (Per Room, 2026)

  • Economy (Select Service): $8,000–$15,000 per key
  • Mid-Scale (Full Service): $15,000–$30,000 per key
  • Upscale: $30,000–$60,000 per key
  • Luxury: $60,000–$150,000+ per key

Note: "Per key" includes pro-rata share of public area FF&E. Guest room FF&E alone is typically 60-70% of total.

Guest Room FF&E Checklist

The guest room is where most of your FF&E budget goes — and where guests spend most of their time. Every item in this list needs to withstand constant use by people who aren't treating it like their own furniture.

Sleep System

  • Mattress — Hospitality-grade, fire-retardant (CFR 1633 compliant). Budget $200-$800 depending on brand tier. Plan 5-7 year replacement cycle
  • Box spring or platform base — Platform bases are increasingly preferred (no dust accumulation, modern aesthetic). $150-$400
  • Headboard — Wall-mounted preferred over bed-frame-attached for durability. Upholstered or laminate. $200-$800
  • Bed frame — Steel bolt-together construction for durability and easy assembly. $150-$500
  • Pillows — Budget for 4 per king, 6 per double-double. Plan annual replacement. $15-$60 each (OS&E, not FF&E, but often bundled)

Recommended Sleep System Vendors

Serta Simmons Hospitality — Market leader in hotel mattresses. Used by major brands from select-service to luxury.

Sealy Hospitality — Strong mid-market option with excellent warranty programs.

Casegoods (Wood/Laminate Furniture)

  • Nightstands (2 per room) — Built-in USB/wireless charging is now standard. Specify soft-close drawers. $150-$500 each
  • Desk or work surface — Integrated power (2 outlets + 2 USB minimum). Size depends on brand standard. $200-$600
  • Dresser/media console — Must accommodate TV (wall-mounted TVs reduce this requirement). $200-$700
  • Luggage rack or bench — Folding or built-in. $50-$200
  • Closet system — Open closet concepts are trending; traditional closets still standard in full-service. $100-$400
  • Mini-bar cabinet (if applicable) — Specify with lock and built-in power for mini-fridge. $200-$500

Seating

  • Desk chair — Must be comfortable enough for work sessions. Commercial-grade upholstery (50,000+ double rubs minimum). $150-$400
  • Lounge chair (upscale and above) — Statement piece in premium rooms. Removable/cleanable covers preferred. $300-$1,200
  • Ottoman or side seating (suites) — $200-$600

Fixtures & Accessories

  • Window treatments — Blackout + sheer combination is standard. Motorized options for upscale. $200-$800 per window
  • Lighting — Bedside (2), desk (1), ambient/ceiling, bathroom. LED throughout. Budget $400-$1,500 per room total
  • Mirror(s) — Full-length (1), bathroom (1), vanity magnifying (upscale+). $50-$300 per mirror
  • Artwork — Original vs. reproduction depends on brand tier. Budget $100-$500 per room
  • Safe — Laptop-sized minimum. $80-$200
  • Iron + ironing board — In-room or closet. $30-$80

Bathroom FF&E

  • Vanity/countertop — Solid surface or engineered stone. $300-$1,500
  • Bathroom mirror — Backlit/LED mirrors increasingly standard. $100-$500
  • Shower enclosure — Frameless glass for upscale. $200-$1,200
  • Accessories — Towel bars, robe hooks, toilet paper holder, soap dispenser (if applicable). $50-$200 set

Public Area FF&E Checklist

Lobby

The lobby sets the first impression. Invest disproportionately here — guests judge the entire hotel by the first 30 seconds.

  • Reception/front desk — Custom millwork or manufactured. ADA-compliant section required. $5,000-$50,000+
  • Lobby seating — Sofas, lounge chairs, side tables. Plan for 1 seat per 3-5 guest rooms. Specify 100,000+ double rub fabric
  • Lobby tables — Coffee tables, side tables, console tables
  • Lighting — Statement chandelier or pendant (lobby), task lighting at seating, ambient/accent
  • Wayfinding/signage — Often overlooked in FF&E budgets. Include it
  • Power access — Every seating group needs accessible power outlets

Restaurant & Bar

  • Dining chairs — Stackable or not? Weight matters for staff. $80-$400 each
  • Dining tables — Stable bases, durable tops. Consider configurable sizes. $150-$600
  • Banquettes/booths — Space-efficient, higher perceived value. $400-$1,500 per linear foot
  • Bar stools — 42" counter height or 30" bar height. Footrest placement critical. $100-$500
  • Bar top/counter — High-durability surface. $100-$300 per linear foot
  • Host stand — Integrated with POS/reservation system. $300-$1,200

Meeting & Conference

  • Conference tables — Modular preferred for flexibility. Integrated AV/power. $500-$5,000+ per table
  • Conference chairs — Comfortable for multi-hour sessions. $200-$800
  • AV equipment — Displays, sound systems, video conferencing. $3,000-$15,000 per room
  • Breakout furniture — Soft seating, high-top tables, mobile whiteboards

FF&E Procurement Timeline

Hotel FF&E procurement requires long lead times. Here's a realistic schedule:

  1. 12-18 months before opening: Design development — finalize room prototypes and FF&E specifications
  2. 9-12 months: Issue FF&E bid packages to purchasing agents or direct to manufacturers
  3. 8-10 months: Evaluate bids, award contracts, submit deposits (typically 50% at order)
  4. 6-8 months: Manufacturing begins. Request shop drawings and approve finish samples
  5. 3-4 months: First shipments arrive at receiving warehouse. Begin QC inspection
  6. 1-2 months: Installation begins (typically after drywall, flooring, and paint are complete)
  7. Opening week: Final punch list, accessory placement, OS&E installation

⚠️ Critical: Use a Receiving Warehouse

Never ship FF&E directly to the job site. Use a third-party receiving warehouse to inspect all deliveries before installation. Damage rates of 5-10% are normal in shipping — catching problems before installation saves 10x the cost of fixing them after.

Working with FF&E Purchasing Agents

For projects over 50 rooms, seriously consider hiring an FF&E purchasing agent. These specialists manage the entire procurement process — from bid solicitation through installation — and typically save 10-20% on product costs through manufacturer relationships and volume purchasing.

What a purchasing agent does:

  • Converts design specifications into detailed bid packages
  • Solicits competitive bids from qualified manufacturers
  • Manages orders, deposits, and shipping logistics
  • Coordinates receiving, inspection, and warehousing
  • Manages installation scheduling and punch lists

Typical fee: 4-6% of total FF&E cost. This is usually offset entirely by the product cost savings they negotiate.

Brand Standards vs. Custom Specification

If you're developing a branded hotel (Marriott, Hilton, IHG, etc.), the brand provides an FF&E specification package that defines approved products, finishes, and layouts. Your flexibility is limited but the process is streamlined.

For independent hotels, you have complete design freedom — but also complete responsibility. This is where working with an experienced hospitality interior designer and purchasing agent becomes essential.

Renovation vs. New Construction

Hotel renovations (PIP — Property Improvement Plans) are a different animal than new construction. Key considerations:

  • Guest displacement: Rooms out of service = lost revenue. Plan renovation in phases to minimize impact
  • Existing conditions: Measure everything. Old buildings have quirks that affect furniture dimensions
  • Phased procurement: Order critical-path items first (casegoods, bathroom fixtures) and soft goods later
  • Sustainability: Consider refurbishing existing furniture where possible. Casegoods can often be refinished for 40-60% of replacement cost

Next Steps

Whether you're developing a new hotel or planning a renovation, we can connect you with experienced hospitality FF&E suppliers and purchasing agents.